powerAPS v27

v27.0.4

30-10-2026

Features

  • Connect-APS now displays the Autodesk consent page for the coolOrange app by default.
    This new app can be securely whitelisted in productive Fusion Manage, Forma, and BIM 360 environments and supports the recently introduced Autodesk Passthrough Billing for premium API usage.

  • powerGate Processor installations add a new “Authorize APS Access” button to the powerJobs window,
    making it easy to grant consent to the coolOrange app for jobs running as the system user.

v27.0.3

20-10-2026

General

  • Setup: EULA handling consolidated in installer

v27.0.2

11-06-2026

Fixed

  • Compatibility with powerVault version: 27.0.3.
    Autodesk SSO assemblies are now loaded only when required, especially when running Connect-APS outside Vault applications (e.g. PowerShell ISE and PowerShell 7 Console).

General

  • Updated shared third-party PostSharp Diagnostics libraries to version 2026.0.9 to ensure compatibility with other products

  • Updated internally used installer framework

v27.0.1

15-04-2026

General

Breaking Changes

Re-Activation after Upgrade (only if no Customer Key is stored)
If powerGate is already activated on a workstations or Job Processor, no action is required after the upgrade.

If no Customer Key is entered in the License Manager and the previous version was activated using a powerJobs Processor or powerJobs Client serial number, or via offline activation, a 30-day powerGate trial will start after the upgrade.

To continue using APS scripts without interruption, enter a Customer Key to activate coolOrange products.
The powerGate license will be retrieved automatically using the Customer Key.